Demo

Demo landing page for an invented renovation company. Built by STRYLA in 48 hours.

UA I want a site like this
MasonBook a foreman

Miami · turnkey renovation · since 2016

A renovation
nobody has
to finish
after us

We run every project like a diary: a photo and three sentences every evening — what got done, what happens tomorrow, where the risk is. Below is the diary of one two-bedroom in Little Havana, all 78 days of it.

Living room after renovation

The foreman reports daily.

The estimate is fixed on signature.

Keys on the day we named.

Living room
0projects left unfinished

“The foreman reported every evening. In 78 days I never once had to go to the site to check on the work.”

Irene, two-bedroom in Little Havana
Kitchen
3years of warranty on concealed work
Bedroom
Price my renovation

The same bathroom

Drag the divider. Left is how we took it on, right is how we handed it back.

Bathroom after renovation
Bathroom before renovation
BeforeAfter

Diary of one project

Two-bedroom, 620 sq ft, Little Havana. 78 days. This is exactly the report that lands in your chat every evening: photographs and a list of the work completed. The stage-by-stage shots stay in the project chat — here you see these rooms as handed over.

  1. Day 01
    Demolition

    Demolition

    Stripped back to the slab, hauled out six dumpsters. Found aluminum wiring from 1978 — told the owner the same day, and it was already in the estimate.

  2. Day 12
    Rough-in

    Rough-in

    New electrical on 32 points, manifold water distribution. Every run photographed before drywall — so a year from now you know where not to drill.

  3. Day 34
    Wet work

    Wet work

    Two inches of floor screed over an isolation strip, plaster run to beads. Then twelve days of drying, no heaters, ventilation only. Shortening this stage causes the tile to crack.

  4. Day 61
    Finishes

    Finishes

    Tile, two coats of paint, luxury vinyl plank over an eighth-inch underlay. Baseboards went in after the built-ins, so there are no gaps.

  5. Day 78
    Handover

    Handover

    Cleaning, every outlet tested, the sign-off signed. Handed over the folder: wiring diagrams, material warranties, spare tile in case of a chip.

Who will be in your apartment

One person is assigned to your project, demolition to sign-off. Every question about schedule or money goes to them, and the number stays the same all 78 days.

  • Foreman One per project

    On site every day: signs off on the crews’ work, keeps the schedule, and writes your evening report in person.

  • Rough-in crew 3–4 people

    Demolition, screed, plaster, electrical, plumbing. First in, done before the finishers arrive.

  • Finish crew 2–3 people

    Tile, paint, flooring, doors. They start on signed-off rough-in and never wait on another trade.

  • Materials runner Our own driver

    Delivers to the schedule. Which is why the crew never loses a day waiting on a delivery.

What the 78 days are made of

The actual schedule of the Little Havana two-bedroom. Drying is a separate stage: its duration does not depend on the budget.

  1. Demolition 5–9 days

    Tear-out, hauling, protecting the entry and elevator

  2. Rough-in 18–26 days

    Electrical, water, drainage, screed, plaster

  3. Drying 10–14 days

    The screed cures. Shortening it causes cracking

  4. Finishes 20–30 days

    Tile, paint, flooring, doors, baseboards

  5. Handover 2–3 days

    Cleaning, testing every point, the document folder

What the labor costs

Cosmetic
$35 per sq ft
Walls, ceilings, floors. The systems are left as they are.
Full gut
$95 per sq ft
Stripped to the slab, new electrical and plumbing, turnkey bathroom.
To a design
$160 per sq ft
Niches, cove lighting, built-in furniture, designer supervision.

Materials are billed separately against receipts — we make nothing on them. On a 620 sq ft full gut the labor works out to roughly $59,000; the foreman gives you the exact figure after the site visit, and it does not move once it’s signed.

You buy the materials

We make nothing on them and take no percentage. You get a list with quantities and links and pay the supplier directly — or hand us a card and we bring back the receipts.

That is 12–18% cheaper than supplying materials through the contractor, and every receipt stays with you. Leftover tile and paint stay in the apartment.

Concealed work
3 yearsPipes, wiring, screed — everything you can’t see afterwards
Finishes
1 yearTile, paint, flooring
Warranty call-out
48 hoursFrom your call to a tech at your door

Book a foreman

The foreman who will run your project comes out, inspects the systems and gives you the actual cost of the work. Site visits inside Miami are free.

STRYLA